"Quality you deserve...Dependability you can count on"

Moisture Remediation


At JMT Commercial Flooring, our mission is to provide flooring solutions and successful installations for our customers. Part of that process requires testing your slab for moisture content and vapor emissions prior to the installation of any products. Moisture can cause adhesive failures, promote mold and mildew growth and, in time, result in product delamination, curling or bubbling.

Product and installation warranties require minimal moisture content, contamination, and emission levels from the subfloor to be maintained before, during, and after installation. If these conditions aren’t met, it your warranty will be voided. We identify and correct moisture problems early to ensure a successful installation and maximum long-term flooring value.

Concrete slab readiness
How do you know your concrete slab is ready to receive floor covering? The universally recognized testing methods for moisture is ASTM F2170 for relative humidity. These tests measure the moisture emitted and contained within the concrete slab. These tests can be conducted within hours and require the environment to remain at 75°F (± 10°F) with a relative humidity of 50% (± 10%) for 48 hours prior to and during the test.

It’s essential to have a fully functioning HVAC system in order for the required environmental conditions to be met before, during, and after the test. In addition to testing for moisture, the surface of your concrete must be pH tested for alkaline salts, which can be brought to the surface of the slab by moisture vapor and lead to flooring adhesive failures.

Moisture transmission
How does moisture transmission occur? There are a number of reasons, but the most common include:
1. Inadequate water drain off from the building — moisture travels from the outside, into and up through the concrete capillaries and through the flooring system.
2. Ground water seeping in from underneath the concrete slab.
3. Rain or rewetting of the slab before the building is enclosed.
4. Improperly installed vapor barrier — the vapor barrier must be installed correctly and be free of holes in order to prevent any vapor from coming up from the ground and through the concrete slab.
5. Another common cause of moisture transmission is a lack of sufficient drying time after your concrete is poured. When the concrete is curing, it takes time for moisture to escape, but construction time constraints and deadlines can leave concrete without adequate drying time. Even pan-poured, upper-level floors can create moisture problems if sufficient curing time isn’t allotted. Normal conditions require 120 to 180 days.

Preventing moisture
How can we prevent these problems? You may never be able to completely prevent moisture problems, but you can minimize them. There are five steps in controlling moisture.
1. Install a quality vapor barrier, making sure there are no holes or cracks
2. Use a low water/cement ratio
3. After the concrete has set, scarify the surface of the concrete to obtain a good bond with flooring adhesives
4. Avoid rewetting of the slab
5. Have a fully functioning and operating HVAC system to meet the required environmental conditions

We fully evaluate and address moisture issues in your concrete, as they will affect your floor coverings for years to come. With our risk reducing work, you enjoy a better, longer-lasting floor that provides you maximum value over the life of your facility.